BUSINESS IMPROVEMENT WORKSHOP · TWO DAYS ON YOUR SITE

How do I release extra capacity? Faster changeovers with SMED.

Before you buy another machine, look at the one you have during a changeover. Every minute it stands still is capacity you have already paid for. Over two days your team films a real changeover, takes it apart step by step, and runs a faster method on the machine.

Book this workshop   See all workshops

2 days

on your site, for up to 8 people

£2,550

plus VAT, mileage charged on top

50%

the usual target cut in changeover time

SOUND FAMILIAR?

If this is your shop floor, this workshop is for you

  • Machines stand still for long changeovers every week.
  • You run big batches to avoid changeovers, so stock and work in progress build up.
  • Changeover time depends on who is on shift.
  • Tools, tooling and paperwork get hunted for after the machine has stopped.
  • You are looking at another machine or more overtime to keep up.

WHY TRAIN THE WHOLE TEAM

One person on a course, or your whole team on your own floor?

Every workshop is theory and real practice together. Your team learns the tool, then uses it straight away on your own business challenges, so you get the learning and the results in the same day.

Sending one person on a course

  • One person learns the tool, away from your site.
  • They learn the theory, then practise on a made up example in a classroom.
  • They come back alone and have to convince everyone else.
  • You pay for the course and the time out, and nothing has changed on the floor yet.

Training your team with Sherpa2

  • Up to 8 of your people learn the same tool together, on your site.
  • Theory in the morning, then real practice on your own business challenges that afternoon.
  • The people who do the job agree the changes, so the changes stick.
  • Real improvements by the end of the day, or your course fee back.

WHAT YOUR TEAM LEARNS

The tools underneath

SMED in seven steps

Single minute exchange of dies. Record the changeover, set a target, separate internal and external work, move what you can outside the stop, streamline the rest, then write it down and train it.

Internal and external work

Internal work can only be done with the machine stopped. External work can be done while it runs. Most changeovers start with everything treated as internal.

The pit stop

A Formula 1 pit stop is the best changeover in the world. The team uses it to rethink what really has to happen while the machine is stopped.

Checklists, shadow boards and trolleys

Simple ways to have every tool and part ready and in the right place before the machine stops.

THE TWO DAYS IN DETAIL

How the two days run

Day One

START

What changeovers cost you

How long the machine stands still each week, and what that capacity is worth.

MORNING

SMED and the pit stop

The seven steps, and what a Formula 1 pit crew teaches about changeovers.

LATE MORNING

Film a real changeover

On your chosen machine, done the normal way by the usual people.

AFTERNOON

Break it down

The team watches the video and writes every step on a sticky note with its time, then sets a target, usually at least half.

END OF DAY ONE

Internal or external

Each step is marked, and the team finds what can move outside the stop and what can be made simpler.

Day Two

MORNING

Get ready

Checklists, tooling and kit prepared, and jobs shared out so people work side by side.

LATE MORNING

Run the new changeover

The team runs the new method on the machine and times it against day one.

AFTERNOON

Refine it

Review the video and the times, fix what slowed it down and agree the next round of ideas.

END OF DAY TWO

Lock it in

Write the new changeover standard, train it, and plan the next machine.

Tony working with a machine operator at a CNC machine
Day two happens at the machine, with the team running the new method and the clock running.

WHAT YOU GET

Your team leaves with

  • A faster changeover on one machine, timed before and after.
  • The capacity released each week, worked out in hours.
  • A changeover standard and a preparation checklist the team wrote.
  • An action list for the bigger fixes, and a method to repeat on the next machine.

WHO SHOULD COME

The setters and operators who do the changeover, their team leader, and someone from maintenance or engineering if you have them. Up to 8 people.

WHAT YOU PROVIDE

A room for the classroom sessions, a machine with a changeover planned during the workshop, permission to film it, and the usual people doing it the usual way. We agree the machine on a short call first.

The promise

If your team does not find improvements worth more than the fee, I will refund the course fee.

QUESTIONS

What people ask about this workshop

Which machine should we pick?

Usually your bottleneck, or the machine that changes over most often. The call before the workshop helps you choose.

Do we have to stop production for the filming?

No extra stops. We film a changeover you would be doing anyway, so it is worth planning one into the schedule for day one.

How much time will we save?

It depends on the machine. The team sets a target on day one, usually at least half the current time, and the promise covers the fee.

Do the two days have to run together?

No. Many teams prefer a gap of a week or two, so tooling, trolleys and checklists can be ready before day two.

Book this workshop

Get in touch for a 15 minute call. We will agree the date and the machine your team will work on.

Book online Call 07775 444378